L3 Energy ConstructionHydrotech lineage · water intrusion since 1999 Login Call(949) 612-4046
The forensic archive
case 077sample entry · illustrative, not a real client

Laguna Beach board-formed wall

Mechanism
lateral hydrostatic load
Level
−6 ft backfill
Location
Laguna Beach, California

An 18-inch board-formed retaining wall bowing an inch and a half. Saturated backfill with no weep path: the wall was holding a pond, not a slope.

Open the report (PDF)

Chapter 1

The pathology

Illustrative moisture map. Bright is wet.

A beautiful wall, leaning an inch and a half toward the terrace.

The wall was the centerpiece of the garden: eighteen inches of board-formed concrete, six feet of retained slope behind it. A hairline crack had opened at mid-height and the cap no longer lined up with the paving.

Every wet winter it moved a little more. The soil behind it never dried, because the water that entered had nowhere to go.

Wall
18 in board-formed concrete, 6 ft retained
Out of plumb
1.5 in at the cap
Weeps
none
Backfill
native clay, saturated to within 1 ft of grade
Surface
planting bed draining toward the wall
Crack
horizontal hairline at mid-height, damp

Chapter 2

Diagnostic reconstruction

terraceretained slopeweep 1234
Section, not to scale. Numbers match the scope of repair.

A wall designed for soil was carrying soil and water together. The work was to find out how much water, and whether the stem could stay.

Plumb survey and crack gaugesfour stations, read monthly

Movement tracked rainfall, with a two-week lag.

Test pitstwo hand-dug pits behind the stem

Standing water at 14 in. No drain rock, no pipe.

Moisture probesbackfill at three depths

Saturated from 1 ft down through the dry season.

Structural reviewby the engineer of record

Stem serviceable once the water load is relieved.

Scope of repair

  1. Backfill excavated in sections; free-draining rock and a perforated drain placed at the heel.
  2. Weep relief cored through the stem at the base.
  3. Positive-side waterproofing on the retained face.
  4. Low-permeability cap and regraded bed to shed runoff away from the wall.

Chapter 3

Restored state

The wall has not moved since. The weeps run after rain and stop a day later, which is what a draining wall does.

Crack gaugesno change, two wintersstable
Backfilldraining; weeps clear after rainactive
Retained facemembrane and drain rockstable
Surface watershed away from the wallstable
Call (949) 612-4046Assess